Pilot-operated, pressure reducing/relieving main stage with integral T-8A control cavity and drain to port 4

Capacity: 10 gpm40 L/min. | Cavity: T-21A
PVDA8 : Pilot-operated, pressure reducing/relieving main stage with integral T-8A control cavity and drain to port 4
Technical Features [ + ]
Technical Data [ + ]
Performance Curves [ + ]
FAQs [ + ]
Notes [ + ]
Additional Resources [ + ]